Today some tack welding and assembling of the transmission tunnel (TT1), rear bulkhead (E1) and rear (C1) frames.
Thursday, September 24, 2009
Chassis construction continues
A lot of measuring, cutting, bending and trimming on the weekend followed by a lot more welding.
Today some tack welding and assembling of the transmission tunnel (TT1), rear bulkhead (E1) and rear (C1) frames.
.JPG)
Today some tack welding and assembling of the transmission tunnel (TT1), rear bulkhead (E1) and rear (C1) frames.
Saturday, September 12, 2009
Chassis construction Begins
After collecting parts for the best part of 12 months, the chassis build has finally started!
The chassis is based on a FMS chassis, check the link for a cool 3D rendering http://www.formulamotorsport.net/Models/L7R/index.html#
A layout of the major sub frames
.png)
Lots of careful measuring, cutting and dressing of material before the first tack weld.
Bottom (A1) and top (B1) frames have been tacked as individual assemblies and then joined with all the interconnecting pieces.
Lot's of welding to come...
.JPG)
.JPG)
The chassis is based on a FMS chassis, check the link for a cool 3D rendering http://www.formulamotorsport.net/Models/L7R/index.html#
A layout of the major sub frames
.png)
Lots of careful measuring, cutting and dressing of material before the first tack weld.
Bottom (A1) and top (B1) frames have been tacked as individual assemblies and then joined with all the interconnecting pieces.
Lot's of welding to come...
Subscribe to:
Posts (Atom)